Get a quote
Room during renovation with the old floor removed, exposed concrete, stacked flooring boxes and patched walls

How the flooring work is agreed in North York

Describe the rooms, discuss the materials and receive a written estimate from MRG before flooring work begins in your North York home.

Request, visit and written estimate

  1. Send the room details

    List the rooms, approximate area, current flooring and the material you want installed.

  2. Talk through the work

    MRG contacts you to understand the job and answer your questions.

  3. Arrange a visit where needed

    We arrange a visit when the rooms need measuring or the floor base needs an inspection.

  4. Review the written estimate

    The work, materials and dates are agreed in writing before work begins.

Describe what stays and what changes

Include the floor in the next room, the baseboards, closet doors and the staircase if the new floor will meet them.

Describe known leaks, movement and earlier repairs before choosing the finish.

If you have photos, mention them in the form and MRG can request them when discussing the job.

The form does not accept photo attachments.

Wood-look plank floor meeting grey tile at a metal doorway transition beneath white door casings
Plank and tile meeting at a metal doorway transition

Work to name in the estimate

Old flooring
Say whether removal and hauling away the waste should be included.
The base
Include the preparation and repairs needed beneath the new floor.
Materials
Agree who buys the flooring, underlay, trim and setting materials.
Furniture
State what needs moving and which rooms must remain usable.
Building access
Send the work hours, elevator requirements and route for deliveries.

Changes found after removal

A photograph cannot show every layer under an old floor or damage hidden below tile.

If damage is found during the work, MRG shows you and agrees the change before extra work starts.

The material and the preparation also affect timing, so dates follow the agreed work and availability of materials.

For tile, the planned sequence includes the time when the floor cannot be used while the setting materials cure.

Questions about how the flooring work is agreed

What happens between a flooring request and the written estimate?

List the rooms, approximate area, current flooring and the material you want installed.

MRG contacts you to understand the job and answer your questions.

We arrange a visit when the rooms need measuring or the floor base needs an inspection.

How should retained floors be described before measuring?

Include the floor in the next room, the baseboards, closet doors and the staircase if the new floor will meet them.

Describe known leaks, movement and earlier repairs before choosing the finish.

If you have photos, mention them in the form and MRG can request them when discussing the job.

Which preparation and edge work should the flooring estimate name?

Say whether removal and hauling away the waste should be included.

Include the preparation and repairs needed beneath the new floor.

Agree who buys the flooring, underlay, trim and setting materials.

Tell us about your floor

List the rooms, the current floor and the finish you want, with the building type and approximate area.

Get a quote
Get a quoteCall